26 lines
443 B
Markdown
26 lines
443 B
Markdown
|
|
# 核对Pavlodar配线表
|
||
|
|
|
||
|
|
| ID | Creation Date | Assignee | Status |
|
||
|
|
|----|----------------|----------|--------|
|
||
|
|
| OSS-99 | 2020-05-15T18:10:51.000+0800 | 贾依蒙 | 完成 |
|
||
|
|
|
||
|
|
|
||
|
|
---
|
||
|
|
|
||
|
|
根据系统公司提供的11个城市配线表核对线缆、机柜、设备、端口的位置、数量的正确性
|
||
|
|
|
||
|
|
## Attachments
|
||
|
|
|
||
|
|
**11329/Pavlodar配线表V1.0-2860.xlsx**
|
||
|
|
|
||
|
|
---
|
||
|
|
|
||
|
|
**11466/核对问题记录.docx**
|
||
|
|
|
||
|
|
---
|
||
|
|
|
||
|
|
**11467/设备间核对.xlsx**
|
||
|
|
|
||
|
|
---
|
||
|
|
|